.jpg&w=3840&q=75)
Copper Tubing
Clean copper pipe and tubing from plumbing applications
Our estimate for this grade didn't line up with its own stated composition, so we removed it rather than show a misleading number. Contact us for a current quote.
Certification Requirements
Required certifications, standards compliance, and verification protocols.
- Copper purity ≥99%
- Contaminant levels
- Cleanliness verification
Rejection Criteria
Conditions and thresholds that trigger immediate rejection or downgrading.
Any visible solder at joints
FULL REJECTION
- Clean Tubing Requirement
- Solder Removal Not Acceptable
Cu <99%
Full rejection
Plumbing-grade minimum purity not met
Pb >0.05%
Full rejection or major credit
Critical refinery concern
Significant pitting or corrosion
Full rejection or reclassification
Compromises tubing integrity
Any fittings not removed
Rejection or credit for removal
Tubing must be cleaned of fittings